Most Westbound Lanes on Bay Bridge Closing Thursday Night for Holiday Wreath Installation

a large artificial holiday wreath sitting in the back of a flatbed work truck parked next to orange traffic cones along a concrete highway tunnel entrance, natu

AI-generated illustration; not a photograph of the reported event.

  • calendar_today November 12, 2026

Bay Bridge Closure Scheduled for Thursday Night

Most westbound lanes on the San Francisco-Oakland Bay Bridge are scheduled to close Thursday night, November 12th, to allow Caltrans crews to place a large holiday wreath above the entrance to the Yerba Buena Island tunnel. The closure will begin at 11 p.m. Thursday and continue until 4 a.m. on Friday, November 13th.

Details of the Lane Closure

According to Caltrans, all but the far left lane on westbound Interstate 80 between the metering lights and the tunnel will be closed. Additionally, the on-ramp from Yerba Buena Island and Treasure Island to the westbound lanes of the bridge will be shut during these hours. The closure is intended to provide a safe workspace as crews complete the annual holiday decoration.

Traffic Detours for Motorists

Motorists traveling from Yerba Buena and Treasure Islands toward San Francisco during the closure period will be required to detour through Oakland. Drivers will be redirected at the toll plaza in Oakland before being able to return to the westbound lanes to access San Francisco. Caltrans officials said detour signage and traffic control personnel will be in place throughout the affected hours to guide drivers. Motorists are advised to expect delays and plan extra travel time.

Background on the Holiday Wreath Tradition

The large holiday wreath being installed is a 13-foot, 300-pound decoration made with artificial foliage, ornaments, and ribbon. Permanent anchors for this wreath were installed above the Yerba Buena Island tunnel in 2011, allowing the same wreath to be reused for annual celebrations. The Metropolitan Transportation Commission, the transportation planning agency for the nine-county Bay Area, oversees this seasonal tradition. The wreath will remain positioned above the tunnel entrance until after the new year.

Advice for Bay Area Drivers

Caltrans encourages all motorists affected by the closure to pay close attention to detour signs and traffic personnel. Anticipate longer travel times during the affected hours and plan accordingly. For ongoing updates and traffic conditions, drivers should monitor official transportation channels.

Closure Summary

  • What: Most westbound lanes on the Bay Bridge closed for holiday wreath installation
  • When: 11 p.m. Nov. 12 – 4 a.m. Nov. 13
  • Where: Bay Bridge, westbound Interstate 80 near Yerba Buena Island tunnel
  • Impacts: Detours via Oakland for Yerba Buena and Treasure Island traffic, traffic delays expected

Source: kron4.com.

Recent Posts

Google Ads

add ads here

Hot Categories